• 1masterplan_abudhabi.jpg
  • 2masterplan_abudhabi.jpg
  • 3a_masterplan_abudhabi.jpg
  • 3b_masterplan_abudhabi.jpg
  • 4masterplan_abudhabi.jpg
  • 5masterplan_abudhabi.jpg
  • 6masterplan_abudhabi.jpg


MULTIFUNCTIONAL BULDING COMPLEX 

 

Location: Abudhabi , Emirates
Type: Proposal for a multifunctional Project
Committee: DIET S.P.A / Ing. Carlo Loro
Architectural Design:  Deonstudio
Project Date:     2008

Detailed Design stage:

unknown
 Lot area:  220.765,00 Sqm 
Gross floor area:   42.765,00 Sqm 

 

The project idea is defined by creating a four similar structures that communicates together through their dynamical composition, these are combined to create internal and external promenades which connects the buildings together, the in between spaces interacts with each other around a water course placed all along the pedestrian space. The Building volumes wraps around and folds in different points to pass over the water course, this is defined in relation to the  various functions needed and the privileged directions of the area.